Loading...
Search
| Friend's email | |
| Your name | |
| Your email | |
| enter code | |
This page was sent successfuly
694 viewed
بکارگیری ضابطه نصب فاز محافظت شده گردش به چپ در تقاطع های چراغدار
کامکاری، مهشید Kamkari, Mahshid
Applicaton of warrant for Installation of Protected Left-Turn Phase at Signalized Intersections
Kamkari, Mahshid | 2010
694
Viewed
- Type of Document: M.Sc. Thesis
- Language: Farsi
- Document No: 42023 (09)
- University: Sharif University of Technology
- Department: Civil Engineering
- Advisor(s): Nassiri, Habibollah
- Abstract:
- Left-turn operation is a critical component in the safe and efficient operation of a signalized intersection. The proper type of left-turn phasing results in reduction of traffic delay and number of accidents. A review of the literature indicates that different warrants have been proposed for the installation of the protected left-turn phase; however, there is not a consensus to implement a specific warrant up to the present. In general, the warrants fall into four categories: traffic volume, operational characteristics of traffic, intersection geometrics and accident experiences. Considering the high rate of accidents resulting from left-turn movements at signalized intersections in Iran, it is important to develop some guidelines to identify the conditions in which the installation of a protected left-turn phase is warranted. In this research, the critical gap data at two signalized intersections of Ferdos-Sazmanbarname and Zanjan-Siadat in Tehran, Iran were used to apply the proposed warrant. Results show that the critical capacities of left-turn volume at these two intersections are 540 and 965 vehicle per hour, respectively. It may be concluded that if the observed left-turn traffic volume at an intersection with characteristics similar to any of the intersections studied exceeds the respected critical capacity, the installation of protected left-turn phase at that intersection is warranted
- Keywords:
- Signalized Intersection ; Left-Turn Movement ; Protected Phase ; Warrant
-
محتواي پايان نامه
- view
