کمینه کردن تعداد کارهای با تاخیر در محیط کارگاه جریان کاری با فرض زمان آماده سازی وابسته به توالی
ورمزیار، محسن Varmazyar, Mohsen
Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem
Varmazyar, Mohsen | 2011
1001
Viewed
- Type of Document: M.Sc. Thesis
- Language: Farsi
- Document No: 41561 (01)
- University: Sharif University of Technology
- Department: Industrial Engineering
- Advisor(s): Salmasi, Nasser
- Abstract:
- This research investigates permutation flow shop scheduling problems with sequence-dependent setup times with minimizing the number of tardy jobs as criterion (Fm|prmu, Sijk|ΣUj). A mixed integer linear programming model has been developed for the research problem. As the problem is shown to be NP-hard, several meta-heuristic algorithms based on tabu search (TS) and imperialist competitive algorithm are developed to heuristically solve the problem. In order to find the best meta-heuristic algorithm, random test problems, ranging in size from small, medium, to large are created and solved by the meta-heuristic algorithms. Then, a detailed statistical experiment, based on split-plot design is performed to find the best meta-heuristic algorithm. The results of the experiment show that the hybrid of TS and Imperialist competitive algorithm has the best performance.
- Keywords:
- Sequencing ; Mathematical Modeling ; Tabu Search Algorithm ; Meta Heuristic Algorithm ; Flow Shop Scheduling ; Minimization Number of Tardy Jobs ; Imperialist Competitive Algorithm
-