Loading...
Search for:
sepehri--sepehr
0.108 seconds
| # | Type | Title | Author | Publisher | Pub. Year | Subjects | Call Number |
|---|---|---|---|---|---|---|---|
| 1 | مقاله | Viral cascade probability estimation and maximization in diffusion networks | Sepehr, A. | IEEE Computer Society, | 2018 |
Computational modeling.
Data models. Estimation. Graphical models. Influence estimation and maximization. Social networks. Toy manufacturing industry. Data structures. Estimation. Importance sampling. Information dissemination. Information services. Monte Carlo methods. Social networking (online) Toy manufacture. Computational model. Diffusion networks. GraphicaL model. Information cascades. Information networks. Information propagation. Manufacturing industries. Social network services. Viral marketing. Probability. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
| 2 | مقاله | Viral cascade probability estimation and maximization in diffusion networks | Sepehr, A. | IEEE Computer Society, | 2019 |
Influence estimation and maximization.
Social networks. Data structures. Estimation. Importance sampling. Information dissemination. Information services. Monte carlo methods. Social networking (online) Toy manufacture. And rare events. Computational model. Diffusion networks. GraphicaL model. Information cascades. Information networks. Information propagation. Manufacturing industries. Social network services. Viral marketing. Probability. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
| 3 | مقاله | Structural virality estimation and maximization in diffusion networks | Sepehr, A. | Elsevier Ltd, | 2022 |
Influence maximization.
Social networks. Diffusion. Depth maximization. Diffusion networks. Diffusion patterns. Influence maximizations. Propagation pattern. Sandwich framework. Social network. Source nodes. Structural virality. Viral cascade. Structural properties. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
| 4 | پایان نامه | دسته بندی داده های چنددسته ای در جویبار داده ها به صورت نیمه نظارتی Multi-cass Semi-srvised Classification of Data Streams | سپهر، آرمان Sepehr, Arman | دانشگاه صنعتی شریف | 1392 | الگوریتم یادگیری Learning Algorithm / دسته بندی چنددسته ای Multiclass Classification / جویبار داده Data Stream / یادگیری تجمعی Ensemble Learning / دسته بندی نیمه نظارتی Semisupervised Classification |
19-44879
|
| 5 | پایان نامه | کنترل وضعیت تحمل پذیر خطای ماهواره با استفاده از شبکه های عصبی Fault-tolerant Attitude Control of Sattelite Using Neural Networks | سپهر، فیروزه Sepehr, Firoozeh | صنعتی شریف | 1393 | شبکه عصبی Neural Network / عملگر Operator / کنترل فعال Active Control / کنترل تحمل پذیر خطا Fault-tolerant Control / کنترل وضعیت ماهواره Satellite Attitude Control |
45-46860
|
| 6 | پایان نامه |
اﻧﺘﺸﺎر اﻃﻼﻋﺎت و ﺗﺎﺛﯿﺮ در شبکهﻫﺎی اجتماعی
Information and Influence Diffusion in Social Network |
سپهر، آرمان Sepehr, Arman | صنعتی شریف | 1401 | بازاریابی ویروسی Viral Marketing / شبکه انتشار Diffusion Network / شبکه های اجتماعی Social Networks / انتشار اطلاعات Information Diffusion / مدل تصادفی Stochastic Model / بیشینه سازی نفوذ Influence Maximization / انتشار تاثیر اجتماعی Social Influence Spread |
19-55313
|
| 7 | مقاله | An analytical model for evaluation of wireless mesh networks | Hamidi Sepehr, F. | 2008 |
Analytical model.
Contention-based. Contention-free. Future networks. Generation rate. IEEE 802.11s. Maximum stable throughput. Modeling approach. Multi-class. Open queueing networks. Stability condition. Wireless nodes. Wireless users. Computer simulation. Farm buildings. Internet protocols. Local area networks. Queueing theory. Standards. Throughput. Ubiquitous computing. Wireless local area networks (WLAN) Wireless mesh networks (WMN) Queueing networks. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
|
| 8 | مقاله | A grid-based collaborative supply chain with multi-product multi-period production-distribution | Sepehri, M. | 2012 |
Collaborative supply chain.
Auto industry. Customer demands. Dynamic membership. Grid services. Grid-based. Multi-period. Multi-products. Multi-stage. Overall costs. Production-distribution. Supply chain costs. Supply chain models. Costs. Supply chains. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
|
| 9 | مقاله | Cost and inventory benefits of cooperation in multi-period and multi-product supply | Sepehri, M. | 2011 |
Inventory reduction.
Multi-period supply. Supply chain. Bullwhip effects. Cooperative supply. Flow network. Holding costs. Inventory policies. Inventory reductions. Just in time. Lower average. Lower cost. Multi-period. Multi-products. Multi-stage. Overall costs. Simulation result. Single period. Total costs. Supply chain management. Supply chains. Cost reduction. Cost-benefit analysis. Industrial competition. Inventory. Product development. Production cost. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
|
| 10 | مقاله | Lesson learned knowledge in project management | Sepehri, M. | Institute of Electrical and Electronics Engineers Inc, | 2015 |
Process.
Information systems. Knowledge management. Management science. Processing. Project management. Current projects. Lesson Learned. Organizational process. Project Management Body of Knowledge. Project management service. Project process. Services. Three-stage system. Information management. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
| 11 | مقاله | Analysis of time delays in projects - application to Iran and emerging countries | Sepehri, M. | 2006 |
Iran.
Standards. Statistical tests. Technology transfer. Organization deficiencies. Organization factors. Organization structure. Project management. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
|
| 12 | مقاله | A quantitative examination of competition, coopetition and cooperation in supply chains | Sepehri, M. | 2011 |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
||
| 13 | مقاله | A multi-period and multi-product optimizer for cooperative supply chains | Sepehri, M. | 2012 |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
||
| 14 | مقاله | Multi-objective sustainable supply chain with deteriorating products and transportation options under uncertain demand and backorder | Sepehri, M. | Sharif University of Technology | 2016 |
Deteriorating products.
Green supply. Possibilistic programming. Sustainable supply chain. Transportation. Deterioration. Green House gases. Supply chains. Transportation. Transportation routes. Deteriorated products. Green supply. Green House Gas (GHG) Possibilistic programming. Replenishment policy. Sustainable supply chains. Transportation vehicles. Sustainable development. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
| 15 | مقاله | Professional resistance against competitive public procurement in Iran | Sepehri, M. | Emerald Group Publishing Ltd, | 2018 |
Iran.
Public procurement. |
$stringUtil.getCallnumberViewFormat($resource.getCallNumber())
|
| 16 | پایان نامه | طراحی ساختار شکست ریسک پروژه ها در سازمان های پروژه محور عمرانی Risk Breakdown Structure (RBS) Identification and Designing for projects | عبدی، مهدی Abdi, Mehdi | صنعتی شریف | 1388 | مدیریت پروژه Project Management / مدیریت خطرپذیری Risk Management / سازمان پروژه محور Project Based Organization / مدیریت خطرپذیری پروژه Project Risk Management / ساختار شکست خطرپذیری Risk Breakdown Structure |
44-39817
|
| 17 | پایان نامه | مدیریت عملکرد سیستم مدیریت ایمنی، بهداشت و محیط زیست (HSE)بر اساس مدل کارت امتیاز متوازن (BSC)مطالعه موردی شرکت مپنا Performance Management of HSE Management System based on BSC Framework-the Case Study of Mapna Corporation | ناصری، امین Naseri, Amin | صنعتی شریف | 1389 | ایمنی Safety / محیط زیست Environment / مدیریت عملکرد Performance Management / کارت امتیازی متوازن Balanced Scorecard / سیستم بهداشت و درمان Health Care System |
44-40650
|
| 18 | پایان نامه | عوامل عدم موفقیت مهندسی مجدد فرایندها از دیدگاه مدیریت منابع انسانی (موردکاوی شرکت کیسون) Identifying Affecting HR Factors on Unsuccessful Reengineering Projects | کردرستمی، ملیکا Kordrostami, Melika | صنعتی شریف | 1388 | مهندسی مجدد فرایند کسب و کار Business Process Reengineering (BPR) / مدیریت منابع انسانی Human Resources Management / سازمان پروژه محور Project Based Organization |
44-40630
|
| 19 | پایان نامه | پیاده سازی سیاست کار در جریان ثابت چندبخشی در زنجیره تامین های مونتاژی Applying Tandem CONWIP Policy to Assembly Supply Chain | شکوهیار، سینا Shokoohyar, Sina | دانشگاه صنعتی شریف | 1392 | زنجیره تامین مونتاژی Assembly Supply Chain / تولید به هنگام Just In-Time / کار در جریان ثابت چندبخشی Tandem CONWIP |
44-44377
|
| 20 | پایان نامه | بررسی و تبیین نقشه راه درس آموخته ها در مدیریت پروژه (مطالعه موردی: شرکت سپانیر) Considering Lessons Learned and Ascertaining Their Roadmap in Project Management (Case Study: Sepanir Company) | آفتابی، میثم Aftabi, Meysam | صنعتی شریف | 1392 | مدیریت دانش Knowledge Management / مدیریت پروژه Project Management / درس آموخته ها Lessons Learned / رویکرد نقشه راه Road Map Approach |
44-44731
|